 Agawa Canyon passes dredging operation and lighthouse
|
 Bow view from the "Menekaunee" section of Marinette
|
 Heading for Marinette Fuel & Dock around 2 a.m.
|
 Approaching the stern of the craneship, William H. Donner
|
 Tug, Stephan M. Asher, assists with the docking
|
 The tug heads back to its dredging operation
|
 Stern view as the unloading begins around 3 a.m.
|
 Bow view as unloading continues
|
 Unloading continues around 8 a.m.
|
 The dredging operation is at work
|
 Bow view unloading
|
 The new salt load is dropped in front of the old one
|
 Side view from near Harbor Town Marina
|
 The ship is just about empty
|
 The dredging continues
|
 Shortly before 8:30 a.m. the ship is empty
|
 The fish tug, D & S, heads back into port
|
 The dredging equipment is moved out of the way
|
 Stern lines are cast off
|
 The ship moves its stern away from the dock
|
 The bow is tight against the dock and still tied to it
|
 The ship begins to back out of the harbor
|
 Close-up
|
 Backing down-river toward the lighthouse
|
 In between the piers (small boat got two "Danger Signals")
|
 Seagulls follow two fishing tugs into port
|
 Fish tug, Pep, heads in for the morning
|
 Fish tug, Something Fishy, does likewise
|
 Another fish tug passes in fromt of the ship as it turns
|
|