 At the dock readying to depart at 4 p.m.
|
 The tug fires up and kicks slightly away from the dock
|
 At 4:15 p.m. the boom is swung out
|
 ... and then back again minutes later
|
 Life ring aboard the tug, Victory
|
 Underway at about 5:50 p.m.
|
 Pulling away from the dock as bridge opens in background
|
 Out in the middle of the Menominee River
|
 Passing fleetmate, Viking I
|
 Heading into the Ogden Street Bridge channel - Note the Marinette County Sheriff Dept. boat in the background
|
 Part way through the bridge
|
 Fleetmates
|
 Making the turn out of the inner harbor
|
 Close up of the stern of the barge and the tug
|
 The tug, Victory, in control
|
 Stern view heading for the lighthouse
|
 Midway between range light and lighthouse
|
 Approaching Menominee North Pier Lighthouse
|
 Marinette Sheriff Dept. heading back in after a great job!
|
 Past the lighthouse
|
 Another view
|
 Heading out for the 2009-2010 shipping season
|
|
|