 Tug, Undaunted docked behind the William H. Donner
|
 Barge ballasted-down at the stern for repairs on May 5
|
 Yellow "containment boom" is for precautionary measures
|
 They need to do some work on the bow thruster
|
 Stern looking like it is sinking ... IT ISN'T!!
|
 (L to R)Undaunted, William H. Donner, Pere Marquette 41
|
 Stern view of the Undaunted
|
 A good look at just how far down the stern actually is
|
 Dock-side view of the barge
|
 Workers peer into the bow thruster tunnel
|
 Another view later that afternoon
|
 Bow view of the barge with a work platform in place
|
 The work platform leads into the bow thruster tunnel
|
 The draft markings on the bow show how high it is riding
|
 The tug still at dock on May 7
|
 Barge still ballasted down as work continues on May 7
|
 Evening, May 7, water is pumped to raise the barge
|
 The draft markings show the bow is lowering
|
 Around 7 p.m. unloading of the barge resumes
|
 The backhoe goes back for another load of pig iron
|
 Around 10 p.m. the barge finishes unloading
|
 The tug comes to pick up the barge
|
 Close-up of the tug, Undaunted
|
 The tug is in place and ready to depart
|
 They move sideways from the dock
|
 Then they do something they haven't done before ...
|
 They turn around in the inner harbor before departing
|
|
|
|