 Finally in port and ready to unload
|
 Broadside view
|
 Crane drops a cable to the dock ...
|
 ... where the lifting cable is attached
|
 Hooks have been attached to both shipboard cranes
|
 The first hook engages one end of a tower section
|
 The second hook lines up on the opposite end
|
 The hook is engaged
|
 Both cranes lift the tower section ...
|
 ... and drop it down to a waiting truck
|
 Wide view of the action
|
 The crane's cable is slackened to disengage it
|
 The hook is free
|
 The hook on the opposite end is also free
|
 The truck heads to a staging area in the yard
|
 The cranes are ready for another "pick"
|
 Another tower section is lowered awaiting a truck
|
 This tower section is a top piece, and well-tapered
|
 The line handled by the man is used to release the hook
|
 The hook is released
|
 Wide view of the KK Integrated Logistics yard
|
 A section from the far side of the ship is next
|
 Both cranes lift in unison
|
 Up and over
|
 The section is twisted to fit through the cranes
|
 Another truck is ready for the section
|
 The guys get ready to release the hook
|
 Towers being unloaded, rock being loaded in distance
|
 Another section heads for the staging area
|
 Dockside view as another section is lifted
|
 The section is lowered to the truck
|
 Close-up of the section being fitted into place
|
 Wide view
|
 The section rests in the truck's cradle
|
 The cranes head back for another section
|
 The truck heads to the staging area ...
|
 ... and I follow them
|
 The truck backs in under the cranes in the staging area
|
 As with the ship, hooks are used to transfer the sections
|
 The section has been lifted from the truck
|
 Wide view of the lift
|
 The truck heads back for another section
|
 The tower section is lowered to a cradle
|
 A forklift places another cradle under the tower section
|
 The cranes are done with this section
|
 Afternoon finds just one crane doing the unloading
|
 A special rig is used when just one crane is working
|
 As with 2 cranes in use, hooks are used to lift sections
|
 ... and lowered to a waiting truck, as before
|
 The hook is ready to be released
|
 I believe the second line is to steady the lift rig
|
 A truck heads to a different staging area in the yard
|
 Cranes lift off the section
|
 The lift rig has longer straps to cradle a section
|
 The strap is wrangled into place
|
 Cinching up the strap
|
 Wide view as the strap is found to have problems
|
 Shorter straps are hooked to a frame on the section
|
 Coordination between crane and truck is vital
|
 A lift is used for a worker to unhook these straps
|
 The straps on the opposite end are being released
|
 The lifting rig is ready to go back for another section
|
|