 Early Sept. 6, the Adriaticborg is ready to head into port
|
 The Selvick tug, Jimmy L, is there to assist
|
 The tug moves in to take a towline from the ship
|
 The tug leads the ship into the Menominee River
|
 In between Government Pier & the lighthouse pier
|
 Passing Menominee North Pier Lighthouse
|
 The lighthouse is framed by the tug and ship
|
 Stern starboard-side view
|
 Bow starboard side view
|
 Making the turn into the inner harbor
|
 "Bow-on"
|
 Heading for the Ogden Street (Menekaunee) Bridge
|
 The bridge begins to oopen
|
 The tug and ship head through the open draw
|
 Just about through the bridge
|
 (L to R) William H. Donner, Adriaticborg, & Viking I
|
 The bridge closes
|
 After nudging ship into dock, tug backs off to dock itself
|
 Close-up at t KK Integrated Logistics East Dock
|
 The tug will dock between the rock barge and the ship
|
 Tug heads into a tight space
|
 Rock barges, tug Buckley and Adriaticborg at KKIL
|
 Later that day, 3 trucks are ready to roll with blades
|
 In another part of the yard, wind towers are "staged"
|
 A truck pulls under the cranes with a tower section
|
 Meanwhile, a tower section is lifted from the ship
|
 The section is twisted to fit between the cranes
|

|

|
 At the staging area, cranes have lifted section from truck
|
 The tower section is being lowered to a waiting truck
|
 Cranes at the staging area lower the section to the ground
|
 Back at the ship, the tower section lowers to the truck
|

|
 The front of the section is on the truck
|
 Close-up of the front of the truck
|
 The rear of the section is on the truck
|
 Wide view of the now loaded tower section
|
 One truck heads to staging area, a second takes its place
|
 This is a top section, and is longer than the last section
|
 You can see the noticeable taper to the section
|
 Close-up of the top section being lowered to the truck
|
|
|
|