 BBC Mississippi unloading on Monday, May 17
|
 Two cranes deposit their load onto a waiting truck
|
 Close-up of the windmill tower section on the truck
|
 Dockside view of the action
|
 Two more trucks wait their turn to be loaded
|
 The rear crane attaches a special lifting device
|
 Close-up of the device
|
 The device is swung aboard
|
 ... and lowered toward the next tower section
|
 Workers grab the cables from the device
|
 ... and attach them to the section to be lifted
|
 We are ready for lift-off using just one crane
|
 The tower section is lifted from the ship's deck
|
 ... and swung around
|
 ... to clear the middle crane
|
 Wide view as the section is hoisted from the deck
|
 ... still coming
|
 Being swung parallel to the ship and waiting truck
|
 ... and lowered toward the truck
|
 Lining up the tower section with the truck
|
 The truck backs into place to receive the tower section
|
 Wide view of the action
|
 The front of the tower rests on the ledge where the man is
|
 The back of the section drops into its cradel on the truck
|
 Wide view with two more trucks waiting their turn
|
 The truck (arrow) backs in to be unloaded
|
 Close-up of the truck
|
 The cranes will lift the section from the truck
|
 A worker hooks the crane's cable to the tower section
|
 Another worker does the same on the opposite end
|
 The section is lifted and the truck moves away
|
 Wide view as the section is lowered toward the ground
|
 The now-empty truck goes back for more
|
 The section is held just off the ground
|
 A forklift fits a special "saddle" under the tower
|
 ... and another one at the other end of the section
|
 ... and the tower section is lowered onto the ground
|
|
|