 A tower section is lifted from the barge, Lake Trader
|
 Frozen tie-down straps speak of a rough trip coming here
|
 An empty truck gets ready to receive the tower section
|
 The tower section is lowered onto the truck
|
 Rear of the section drops into a cradle on the truck
|
 Close-up of ice on the tie-down straps at front of section
|
 Mary E. Hannah steadies the barge as it is unloaded
|
 Another tower section is lifted by the mobile cranes
|
 Ice is visible on the top of the tower section
|
 Brrrrr!!
|
 A different truck waits to receive a load
|
 Truck backing in under the waiting tower section
|
 More ice at the front of the section
|
 The other end is lowered into the cradle on the trailer
|
 Section is just about secured
|
 Ice on the tower section in the storage area of the dock
|
 Close-up of the iced area of the section
|
 A view from the Ogden Street (Menekaunee) Bridge
|
 Also in port is the Pere Marquette 41/ Undaunted
|
 It is being loaded with large rock for lower Lake Michigan
|
 Mantsinen crane drops a load onto the barge
|
 ... and heads back for more
|
 Close-up of the crane preparing to grab a load of rocks
|
 ... and lowering the rocks onto the barge
|
 A view from astern as loading continues
|
 The crane grabs more rocks
|
 ... and stretches out to lower it onto the barge
|
 Note the picnic table on the stern of the tug, Undaunted
|
 Front-end loader moves rocks from storage area across road
|
 ... and drops it into position for the crane to pick up
|
 Crane picks up a load of the rock dropped by loader
|
|
|